Project Name: Nairobi Line 3 BRT Review & Re-Design |
Duration
June 2021 to September 2022 |
Client
Agence Française de Développement |
Project Features
The Line 3 BRT corridor connecting Hospitals through the CBD along Juja Road and Koma Road Road to Dandora has been in planning and design since 2016. |
Far East Mobility Role
Far East Mobility reviewed the Line 3 BRT design and proposed improvements in many areas. We radically changed the BRT station configuration to provide double or triple the capacity of the initial design, and developed a revised operational concept based on third generation direct service BRT operations. We developed a design concept for a BRT station at Outer Ring Road which would integrate with a future BRT corridor along the Outer Ring Road and provide many advantages over the previous design.
|
Updated: 19/02/2022 |